Boat Dock - Repair May 9th

arcoughlin

From our boat dock chairman Chris:

We have a few issues that need to be resolved by our installer.

1. Middle dock section slipped on poles

2. 12' section requires additional support installed.

3. End "T" section was not bolted correctly and has come loose.

The installer is planning to make the repairs on May 9th.


 
 
 